Help

Pool plan questions.

What to know before choosing a plan, bidding your project or preparing an order.

How does an owner-builder project work?

Start with a design, fit it to your property, and ask your building department which documents and inspections apply. Use a shared scope to compare bids from individual trades.

Can a concept be used to apply for a permit?

A concept helps you choose the layout. Verify survey conditions, local submittal requirements and any required site-specific engineering before applying or bidding from construction sheets.

What is in the planned plan package?

The proposed package includes dimensioned layout and excavation drawings, a plumbing schematic, equipment schedule, materials list and trade bid scopes. Final inclusions will be listed on each released plan.

Where do I buy equipment and CPVC parts?

PoolParts.com is the planned storefront for equipment and specified plumbing components, with home delivery. Store access, inventory and shipping details will be confirmed before orders open.

Should I order parts before local review?

Have the installer review the current drawings and material list before buying. Match models, sizes and connections to the approved project documents and confirm any substitutions with the responsible professional.